Thursday, November 14, 2013

Water Well Improvements

The final stages of the additional well and electrical component upgrades are happening today. The next two weeks will consist of tuning the new system to operate efficiently for irrigation water production.
It's a much more sophisticated system than the old. The new well will be using a variable frequency drive (VFD) motor and a water level transducer to regulate water flow during low groundwater events. The original well will still use a motor saver that cuts power for a specified period of time under the same circumstance.
Both wells were fit with flow meters for monitoring well production.












This is a major improvement and will aid ERGC in reducing City water use during our peak irrigation season.

- Posted using BlogPress from my iPhone

Bunker Renovation Progress

The ERGC maintenance crew is hard at work. 5,000 sqft of bunker renovation this week.









11 fairway left and 12 green-side.

When you see the maintenance staff on course, please tell them how much you appreciate their hard work.

- Posted using BlogPress from my iPhone

Location:Empire Ranch Golf Club

Wednesday, November 6, 2013

Much More Than "Adding A Little Sand"

We have started work on one of six more bunkers to be renovated. Here is a good photo of how much a bunker edge can change through regular maintenance and play.

This is number 10 green-side bunker. The original bunker lip was located by cutting back the sand/turf layer until the soil lip was found.



I marked on the photo to illustrate the the first step of our renovation- establish the original footprint of each bunker.

Again, each bunker will have Klingstone liquid spray-on liner, new drainage, sand and minor sod work.

Thank you

- Posted using BlogPress from my iPhone
Location:Haddington Dr,Folsom,United States